|
projects |
||||
|
|
||||
|
secondary |
||
|
|
||
LaRue
County High School
|
|
|
This new 88,000 sf / 650 student high school was built on property adjacent to the old high school, which was then remodeled to become the middle school, creating a "campus" environment. The cafeteria, auditorium and library are centrally located in the building, with applied arts and sciences in the single-story left wing, and all other classes and labs in the two-story wings. |
|
|
|
|
|
|||
|
|
||||||
|
Peck Flannery Gream Warren |
||||||
|
© 2008 Peck Flannery Gream Warren Inc. All Rights Reserved |
||||||